Electrical  /  HVAC  /  Remote bid support

Bid more work
without hiring
an estimator.

On-demand takeoffs and bid packages for electrical and mechanical contractors. You send the plans and the bid date. You get back a full takeoff, an organized recap you can price from, and a written list of every gap in the drawings — usually in three to five business days.

Two trades
Electrical & mechanical, one estimator
3–5 days
Typical turnaround on a full package
US Eastern
Year-round, no daylight saving shift

01 — The problem

Most contractors lose work at the takeoff, not at the price.

Bids you had to pass on

A set lands on Tuesday, it's due Friday, and there's no one free to take it off. That's revenue that never had a chance.

Scope found after award

The irrigation controller in the civil notes. The smoke-detector shutdown on the mechanical sheets. The feeder that's on the riser but not in the schedule. It's always on a sheet somebody didn't read.

A number you can't defend

If the general contractor asks what's behind a line and the answer is "that's what we usually carry," the bid is already in trouble.

02 — What you get

Two trades. One estimator. One consistent format.

Division 26

Electrical estimating

  • Electrical drawing and specification review
  • Material, fixture and equipment takeoffs
  • Branch-circuit, feeder and device quantities
  • Labor calculations and an organized bid recap
  • Scope-gap review with inclusions and exclusions
  • One reasonable clarification revision included

Division 23

HVAC & mechanical estimating

  • Mechanical drawing and specification review
  • Equipment and accessory schedule takeoff
  • Ductwork, fittings, insulation and accessories
  • Grilles, registers, diffusers and controls
  • Refrigerant, condensate and gas-piping quantities
  • Labor calculations, scope gaps and bid recap

Every package ships with a questions document. Not a list of disclaimers — the specific things the drawings don't answer, each one citing the sheet and note it came from. It's the difference between a takeoff and a bid, and it's the document general contractors actually reply to.

03 — Pricing

Published rates. Firm quote before any work starts.

All rates are starting prices. Every project is reviewed before a firm price and delivery date are confirmed — you approve the number before anything begins.

Small residential

$200+

Replacements and small scopes

Small commercial

$250+

Light commercial and tenant work

Custom homes

$450+

Quoted after plan review

Medium commercial

$650+

Scope and sheet count reviewed

Large commercial

Custom

Firm price provided in advance

Rush service

+25%

Subject to availability

Service terms

  • Typical turnaround 3–5 business days
  • Large projects: schedule confirmed after review
  • Additional revisions or added scope $65/hour
  • 50% to begin, balance due on delivery
  • Addenda, redesigns and scope changes are extra
  • Final bid review and submission remain with you

Awarded-project success fee — 0.5%

Optional, and only when agreed in writing before work begins. The fee is based on the original awarded contract amount, and your initial estimating fee is credited toward it.

Standard exclusions

Engineering or stamped design, permits, site visits, supplier quotations, bonds, bid submission, and guarantee of project award — unless specifically included in writing. On mechanical work, Manual J/S/D calculations and equipment selection are also excluded.

04 — Sample work

See the actual deliverable before you send anything.

These are complete packages for Westgate Retail Center, a fictional 4,200 sf tenant improvement built specifically to show the format. The drawings, quantities and prices are invented — no client information appears in them. The format is exactly what you'd receive.

What the review actually catches

Anonymised from real packages. No client, project or identifying detail — these are the kinds of findings the scope-gap review is for.

Case 01

A 123-sheet civil set with no electrical sheets at all. The electrical scope was scattered across callouts at five separate structures. Found it, priced it, and flagged that a $6,500 cabinet allowance was really a $90,200 vendor package — the drawings described a control cabinet, the vendor quote described a full SCADA panel.

Case 02

A sheet with two views and a matchline. The conduit runs didn't stop at the matchline — they continued in the lower view. The runs were 375 and 320 feet, not the 200 and 250 a first pass assumed. That one was the general contractor's money, and telling them cost us nothing.

Case 03

A pump panel detail whose specification block still read JOB #: JXX-XXXX — an unfilled template. Its stated voltage and full-load amps were the form's defaults, not the station's. The service had been sized from them. Re-sized it against the equipment actually being bought.

Case 04

Two contract documents disagreeing about GFCI. One cited NEC 210.8(B), which covers receptacles; a panel schedule note said all receptacles and equipment. Half the kitchen items were hard-wired. Priced the code note, published the add for the other reading, and put the conflict in writing.

05 — How it works

Three steps. No surprises.

  1. 1

    Send plans

    Email the drawings, the scope and the bid date. PDFs are fine — that's how they arrive anyway.

  2. 2

    Approve the quote

    You get a firm price and a delivery date before any work starts. Nothing begins until you say go.

  3. 3

    Receive the estimate

    An organized takeoff, a bid recap you can price from, and the questions document.

06 — Why TradeScope

Built by someone who reads the whole set.

On your clock, all year

TradeScope works US Eastern hours year-round. Based in Colombia, which sits on Eastern time and doesn't observe daylight saving — so the hours never drift. A GC calls at 9am and someone picks up.

Both trades, one format

Electrical and mechanical from the same estimator, in the same format. When the smoke-detector shutdown is on the mechanical sheets and the circuit is on the electrical ones, somebody has to be reading both.

Numbers you can stand behind

Quantities are derived from the engineer's own schedules and load calculations wherever the drawings allow it, so counts are arithmetic rather than judgement. Where something genuinely can't be measured, it's carried as a stated allowance and labelled as one.

07 — Send plans

Send the plans. Get a firm quote back.

Tell me the trade, the scope and the bid date. You'll get a firm price and a delivery date before anything starts — and if it isn't a good fit, I'll say so.